Sorry, you need to enable JavaScript to visit this website.

Reset
Refine By:
Document Year Range
Publisher(s)
Reset

Sort By: Relevancy

  • Report  |   2015

    Nam Theun 2 Hydroelectric Project

    Author(s): Sinha, Sidharth

    This case study prepared by the Indian Institute of Management presents Nam Theun 2 (NT2) Hydroelectric project, which includes the development, construction, and operation of a 1,070 MW power plant. Nam Theun 2 is a cross-border Independent Power Producer (IPP) project following a Build-Own-Operate-Transfer (BOOT) structure between Thailand and...

Connect

  • connect